Project and Co-Operations for last 5 years

Date

Client

Description

07/2014

KazTransGas

Karaganda Basin CBM, in Kazakhstan, started in 2104, Deposit size 412 sq. km, coal volumes 2.2 blln ton, expected gas output for 20 years 42 bln cubic m.

04/04/2013

Rus-Oil

Full Engineering documentation for GTLplant for

01/12 -

08/2013

Tau-Ken-Samruk

Chernigovskiy Coal Deposit Development

With CTL technology feasibility study and agreement to make full EPC contract.

12/2012

EMF and Eltron, USA

Agreement to work on Pilot  CTL plant and new Fischer-Tropsch  catalysts

09/2011 - 06 / 2012

Timano-Pechersk Gas Company

Intinsko-Kozhimskiy

Natural Gas Deposits Development

06/2011

- 05/2012

JSK “TEK MOS Energo”/

Fichtner

YMAO oil gas from crude oil fields development with GTL process

2010-2011

Basic Equipment, USA

Sub-contract on engineering for chemical complex for natural gas processing to ethylene.

2008 - 2009

CGPN, China, Research on CBM and UCG

Consulting on coal bed methane drilling and processing at their deposit and renovation into UCG process

2009 -2010

For Petronax with CHEMEX

Gas processing plant into methanol and chemicals to Malaysia

2008

EMF, USA

Agreement on Cooperation for GTL plants in Russia and Kazakshtan

2008-2010

KOMMESKTECHNO-Stroy

Supply two horizontal drilling complexes and training

2007-2010

GasTech, США

Coal Methane Processing Plant

1998-2010

LLNL and Gastech cooperation

UCG pilot project for four horizontal wells turned from CBM to UCG syngas with calorific value to 10 MJ. Per 1 cub. m-